Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Feb 15, 2021     39-6 Control System Step 1-2 - (1.5 hours)       Category: Controls
Fabricate the spaces F-1063C and drilled hole 1/8".
Preassembled the Elevator Idler arm with the spacer and the VA-146 Flange Bearing. Matchdrilled and final drilled with #30 for -4 rivets.
Primed the different parts and final riveting with AN470AD4-6 rivets.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.